Description
The earthquake performance analysis and strengthening projects of the industrial building, which has a 20 meters high ground and mezzanine floor, with a beeching carrier system belonging to Roketsan, was carried out in partnership with INTAC Engineering and OBS Earthquake Engineering Solutions.