Zonguldak Catalagzi Thermal Plant
Description
The industrial structure, which belongs to Eren Energy, was constructed by Endem Construction. Intac was awarded by Endem for designing the turbine structure, the operation center and the boiler house. The total structure sums up to 2000 tonnes of steel construction. Intac has provided construction detail drawings.